<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Grid &#8211; Hydroplan &#8211; Hydropower Consultancy</title>
	<atom:link href="https://www.hydroplan.co.uk/portfolio-type/grid/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.hydroplan.co.uk</link>
	<description>Renewable Energy &#38; Hydropower Specialists</description>
	<lastBuildDate>Wed, 09 Dec 2020 10:08:09 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=5.5.9</generator>

<image>
	<url>https://www.hydroplan.co.uk/wp-content/uploads/2016/04/cropped-site-icon-32x32.png</url>
	<title>Grid &#8211; Hydroplan &#8211; Hydropower Consultancy</title>
	<link>https://www.hydroplan.co.uk</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Moy HV Network</title>
		<link>https://www.hydroplan.co.uk/portfolio/moy-hv-network/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=moy-hv-network</link>
		
		<dc:creator><![CDATA[hYdr0pl4NusrN4m]]></dc:creator>
		<pubDate>Mon, 02 Nov 2015 13:06:52 +0000</pubDate>
				<guid isPermaLink="false">http://www.hydroplan.co.uk/?post_type=portfolio&#038;p=1938</guid>

					<description><![CDATA[<p>&#160; The Final element of the wider Corrour Estate hydro project was the completion of a substantial 33kV &#38; 11kV</p>
<p>The post <a href="https://www.hydroplan.co.uk/portfolio/moy-hv-network/" target="_blank">Moy HV Network</a> first appeared on <a href="https://www.hydroplan.co.uk/" target="_blank">Hydroplan - Hydropower Consultancy</a>.</p>]]></description>
										<content:encoded><![CDATA[<p><div class="portfolio-single-detail-entry">
						<span class="portfolio-single-detail-name">Client : </span>
						<span class="portfolio-single-detail-content">Corrour Estate</span>
					</div><div class="portfolio-single-detail-entry">
						<span class="portfolio-single-detail-name">Location : </span>
						<span class="portfolio-single-detail-content">Highlands, Scotland</span>
					</div><div class="portfolio-single-detail-entry">
						<span class="portfolio-single-detail-name">Project Date : </span>
						<span class="portfolio-single-detail-content">2017-2018</span>
					</div><div class="portfolio-single-detail-entry">
						<span class="portfolio-single-detail-name">Network : </span>
						<span class="portfolio-single-detail-content">50km of HV cable, 7 Private Substations</span>
					</div></p>
<p>&nbsp;</p>
<p>The Final element of the wider <a title="Hydro Project - Corrour Estate" href="https://www.hydroplan.co.uk/portfolio/corrour-estate/">Corrour Estate hydro project</a> was the completion of a substantial 33kV &amp; 11kV private network. This project not only brought electricity for the first time to areas of the Estate, but includes major upgrade works to the SSE Grid Supply Point at Rannoch Power Station on Loch Rannoch, seven Private Substations (33kV &amp; 11kV), four Hydro Power Stations, over 50km of new buried HV cable, nine LV transformers and two network transformers.</p>
<p>This private HV Network now supplies a mainline railway station, a Youth Hostel, the Station Restaurant, 9-holiday cottages, accommodation for the Estate’s 12 staff, BT &amp; Vodafone masts and the main Estate Lodge.</p>
<ul>
<li>New 11kV substation created at Ghuilbinn Power Station.</li>
<li>6km of new 11kV underground cable laid between Ghuilbinn &amp; Moy via Luiblea, crossing the River Ghuilbinn and River Spean.</li>
<li>New 11kV substation at Luiblea providing local LV supply to 3 domestic properties, taking them off diesel generator for the first time ever.</li>
<li>New 11kV substation at Moy providing local LV supply to 3 domestic properties and Estate Office, taking them off diesel generator for the first time ever.</li>
<li>Increased electrical capacity will provide future capacity for the transition from oil &amp; gas heating to electric, further removing the Estate’s requirements for fossil fuels.</li>
<li>Power to this new network will be provided by the Estate&#8217;s four hydro schemes.</li>
</ul>
<p>&nbsp;</p><p>The post <a href="https://www.hydroplan.co.uk/portfolio/moy-hv-network/" target="_blank">Moy HV Network</a> first appeared on <a href="https://www.hydroplan.co.uk/" target="_blank">Hydroplan - Hydropower Consultancy</a>.</p>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>North West Grid</title>
		<link>https://www.hydroplan.co.uk/portfolio/north-west-grid/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=north-west-grid</link>
		
		<dc:creator><![CDATA[hYdroS60]]></dc:creator>
		<pubDate>Mon, 25 Feb 2019 14:55:58 +0000</pubDate>
				<guid isPermaLink="false">https://www.hydroplan.co.uk/?post_type=portfolio&#038;p=2621</guid>

					<description><![CDATA[<p>&#160; In 2014, Hydroplan took on the role of coordinating the connection of the Scottish North West grid to the</p>
<p>The post <a href="https://www.hydroplan.co.uk/portfolio/north-west-grid/" target="_blank">North West Grid</a> first appeared on <a href="https://www.hydroplan.co.uk/" target="_blank">Hydroplan - Hydropower Consultancy</a>.</p>]]></description>
										<content:encoded><![CDATA[<p><div class="portfolio-single-detail-entry">
						<span class="portfolio-single-detail-name">Client : </span>
						<span class="portfolio-single-detail-content">Scottish and Southern Energy (SSE)</span>
					</div><div class="portfolio-single-detail-entry">
						<span class="portfolio-single-detail-name">Location : </span>
						<span class="portfolio-single-detail-content">Garve, Highlands</span>
					</div><div class="portfolio-single-detail-entry">
						<span class="portfolio-single-detail-name">Project Date : </span>
						<span class="portfolio-single-detail-content">2014–2017</span>
					</div><div class="portfolio-single-detail-entry">
						<span class="portfolio-single-detail-name">Network : </span>
						<span class="portfolio-single-detail-content">North West Grid</span>
					</div></p>
<p>&nbsp;</p>
<p>In 2014, Hydroplan took on the role of coordinating the connection of the Scottish North West grid to the Grudie Bridge Grid Supply Point (GSP) to accommodate existing and future hydropower generation in the region. The North West of Scotland was severely grid constricted and connections were both expensive and transmission constrained. Hydroplan was responsible for the design, project management and cumulative grid impact studies to assess the effect of connecting the schemes to the grid on the existing capacity.</p>
<p>The cost of connecting a number of remote schemes to the national grid was shared by the North West Grid Cluster, which was set up for this purpose. The connection was carried out in two phases over two years. The first phase saw the connection of 25 sites, with an additional seven connected in the second phase. The project required approximately 30km of new/upgraded grid poles, a new substation and several new transformers.</p>
<p>In addition, transmission works were undertaken at the Grudie Bridge Supply Point in order to export power from the region.</p><p>The post <a href="https://www.hydroplan.co.uk/portfolio/north-west-grid/" target="_blank">North West Grid</a> first appeared on <a href="https://www.hydroplan.co.uk/" target="_blank">Hydroplan - Hydropower Consultancy</a>.</p>]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
