<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Dam Engineering &#8211; Hydroplan &#8211; Hydropower Consultancy</title>
	<atom:link href="https://www.hydroplan.co.uk/portfolio-type/dam-engineering-hydropower/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.hydroplan.co.uk</link>
	<description>Renewable Energy &#38; Hydropower Specialists</description>
	<lastBuildDate>Wed, 09 Dec 2020 10:02:03 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=5.5.9</generator>

<image>
	<url>https://www.hydroplan.co.uk/wp-content/uploads/2016/04/cropped-site-icon-32x32.png</url>
	<title>Dam Engineering &#8211; Hydroplan &#8211; Hydropower Consultancy</title>
	<link>https://www.hydroplan.co.uk</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Rannoch Dam</title>
		<link>https://www.hydroplan.co.uk/portfolio/rannoch-dam/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=rannoch-dam</link>
		
		<dc:creator><![CDATA[hYdr0pl4NusrN4m]]></dc:creator>
		<pubDate>Thu, 28 Jul 2016 07:30:47 +0000</pubDate>
				<guid isPermaLink="false">http://www.hydroplan.co.uk/?post_type=portfolio&#038;p=1740</guid>

					<description><![CDATA[<p>&#160; Following the decision to upgrade the existing hydroelectric scheme on Ardtornish Estate (Scotland); preliminary ground investigation confirmed that the</p>
<p>The post <a href="https://www.hydroplan.co.uk/portfolio/rannoch-dam/" target="_blank">Rannoch Dam</a> first appeared on <a href="https://www.hydroplan.co.uk/" target="_blank">Hydroplan - Hydropower Consultancy</a>.</p>]]></description>
										<content:encoded><![CDATA[<p><div class="portfolio-single-detail-entry">
						<span class="portfolio-single-detail-name">Client : </span>
						<span class="portfolio-single-detail-content">Ardtornish estate</span>
					</div><div class="portfolio-single-detail-entry">
						<span class="portfolio-single-detail-name">Location : </span>
						<span class="portfolio-single-detail-content">Scotland</span>
					</div><div class="portfolio-single-detail-entry">
						<span class="portfolio-single-detail-name">Project Date : </span>
						<span class="portfolio-single-detail-content">2012</span>
					</div><div class="portfolio-single-detail-entry">
						<span class="portfolio-single-detail-name">Capacity : </span>
						<span class="portfolio-single-detail-content">15m high dam</span>
					</div><div class="portfolio-single-detail-entry">
						<span class="portfolio-single-detail-name">Outcome : </span>
						<span class="portfolio-single-detail-content">Category B structure, part of a cascade of dams</span>
					</div></p>
<p>&nbsp;</p>
<p>Following the decision to upgrade the existing hydroelectric scheme on Ardtornish Estate (Scotland); preliminary ground investigation confirmed that the ground conditions were not sufficient for the planned hydro scheme and a decision was made to undertake a more detailed investigation, which included rock drilling and geochemical testing of the samples.</p>
<p>Two 10m deep vertical rotary cored boreholes and one 10m inclined rotary cored borehole were drilled and samples were sent to a geotechnical laboratory for testing. The test results confirmed that the ground in the immediate vicinity of the proposed dam site needed to be improved in order to allow safe construction and operation of the proposed dam. It was determined that a number of holes would be drilled which would be filled with grout consisting of a mixture of cement and bentonite. A total hole length of over 400m was drilled. Over three tons of cement and bentonite were used to inject into the grout holes and after completion, each hole was tested for permeability.</p>
<p>The test results were accepted as satisfactory, and three years after the dam was completed, the regular dam inspection confirmed that the structure is sound and working as designed.</p>
<p>&nbsp;</p><p>The post <a href="https://www.hydroplan.co.uk/portfolio/rannoch-dam/" target="_blank">Rannoch Dam</a> first appeared on <a href="https://www.hydroplan.co.uk/" target="_blank">Hydroplan - Hydropower Consultancy</a>.</p>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Ederline</title>
		<link>https://www.hydroplan.co.uk/portfolio/ederline-dam/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=ederline-dam</link>
		
		<dc:creator><![CDATA[hYdroS60]]></dc:creator>
		<pubDate>Fri, 08 Feb 2019 14:11:56 +0000</pubDate>
				<guid isPermaLink="false">https://www.hydroplan.co.uk/?post_type=portfolio&#038;p=2565</guid>

					<description><![CDATA[<p>  The Ederline hydro scheme (1900kW) is located to the southwest of Loch Awe in the west of Scotland. In</p>
<p>The post <a href="https://www.hydroplan.co.uk/portfolio/ederline-dam/" target="_blank">Ederline</a> first appeared on <a href="https://www.hydroplan.co.uk/" target="_blank">Hydroplan - Hydropower Consultancy</a>.</p>]]></description>
										<content:encoded><![CDATA[<p><div class="portfolio-single-detail-entry">
						<span class="portfolio-single-detail-name">Client : </span>
						<span class="portfolio-single-detail-content">Ederline Estate</span>
					</div><div class="portfolio-single-detail-entry">
						<span class="portfolio-single-detail-name">Location : </span>
						<span class="portfolio-single-detail-content">Ederline, Scotland</span>
					</div><div class="portfolio-single-detail-entry">
						<span class="portfolio-single-detail-name">Project date : </span>
						<span class="portfolio-single-detail-content">2009-2013</span>
					</div><div class="portfolio-single-detail-entry">
						<span class="portfolio-single-detail-name">Capacity : </span>
						<span class="portfolio-single-detail-content">1.9MW</span>
					</div></p>
<p><strong> </strong></p>
<p>The Ederline hydro scheme (1900kW) is located to the southwest of Loch Awe in the west of Scotland. In 2009, Hydroplan began with the development of the scheme, which included a dam on Loch Gainmheach. The dam spans the mouth of the Socaich Burn and by raising the loch level it reverses the flow into the adjacent Loch nan Ceàrd Mòron, which has an intake to the penstock pipeline at the far end. A compensation flow is passed through the dam, continuing its natural flow downstream. At times of high water levels, the excess water flows unimpeded over the dam to join the natural river flow. The dam was completed in October 2013.</p>
<p>The scheme has a static head of about 214m which is converted to electrical energy via a twin Jet Pelton turbine. The turbine is controlled autonomously by a programmable logic controller (PLC) and operated through a human-machine interface.</p>
<p>Embedded within the PLC are Stop Start Initialisation (SSI) and reservoir fluctuation control smart control loops. The SSI allows the revenue of the stored water to be optimised at times of day when the best energy prices are available by breaking down the 0.7m reservoir operating range into four water level bands. At times, manual override is required in certain weather events to optimise revenue.</p>
<p>On Loch Gainmheach, artificial rafts are installed during the summer months to encourage the breeding success of a native protected bird species – the Black Throated Divers. The operation of the reservoir is aligned with this aim by controlling water level fluctuations to less than 0.4m per week. This restriction has been successful except at times of flood or drought events.</p><p>The post <a href="https://www.hydroplan.co.uk/portfolio/ederline-dam/" target="_blank">Ederline</a> first appeared on <a href="https://www.hydroplan.co.uk/" target="_blank">Hydroplan - Hydropower Consultancy</a>.</p>]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
